Not known Details About LINE官网
Procedure on the overhead conductor rails at Shaw's Cove Railroad Bridge in Connecticut In the movable bridge that employs a rigid overhead rail, There exists a ought to transition in the catenary wire system into an overhead conductor rail with the bridge portal (the last traction present pylon before the movable bridge). Such as, the ability prov